The project involved sludge thickening improvements that include removal of an existing abandoned dissolved air flotation thickener (DAF), the installation of a new 3.0m gravity belt thickener (GBT), constructed new partition walls to enclose the GBT room, the replacement of an exterior window wall system, installation of a new concrete loading dock, and associated HVAC and electrical work.







