Sr. Resident Project Representative was responsible for overseeing construction phase of headworks improvements, secondary treatment system improvements (convert MLE to 4-stage Bardenpho process), tertiary ballasted flocculation and standby power. Oversaw the construction of numerous baffle walls and installation of aeration bubble system which was set to manufacturers specifications. Also oversaw the installation of a secondary Continue Reading
Resident project representative responsible for the oversight of sludge thickening improvements that includes removal of an existing abandoned dissolved air flotation thickener (DAF), the installation of a new 3.0m gravity belt thickener (GBT), constructing new partition walls to enclose the GBT room, the replacement of an exterior window wall system with a new wall/window system, Continue Reading
Resident project representative that oversaw the installation of 3500 lf of 12” water main with numerous hydrants and gate clusters. Traffic control was a major component of the job as well as keeping business entrances unencumbered. Due to the state highway work, half of this project was performed at night. In addition to the dozens Continue Reading
Owner’s project representative responsible for the construction of a water pump station. The pump station included a new 30’ x 50’ masonry one story building that included pre-cast plank roof with EPDM roofing. The building was built over an existing 24” well casing. Two chemical rooms were constructed that fed two storage tanks, pumps, injections Continue Reading
Sr. Project Representative for a major Wastewater treatment plant upgrade. Upgrade included complete electrical upgrade from electrical service to switch gears, Main MCCs, ATS, numerous new control panels, house service panels, conduit and wire to all equipment Also include was new generator 1000 KVA Cummins generator, new influent pumps, primary sludge pumps, Plant water pumps, Continue Reading
Resident project representative responsible for the oversight of the rehabilitation of sewer segments in the Town of Canton to eliminate infiltration through the use of trenchless repair methods to rehabilitate sewer segments and sewer manholes. Bidders shall demonstrate sufficient experience with trenchless repair methods. In general, the base bid work consists of the following approximate Continue Reading
Our RPR oversaw the significant topography regrading of a large south shore development. Within that footprint, was the installation of numerous drain and sewer manholes with associated piping systems. In addition to that was a large onsite septic disposal. All finish grading, looming, seeding is being completed in the Fall of 2024.
Resident project representative responsible for the oversight of furnishing all labor, services, equipment, and materials for approximately 30,000 linear feet of CIPP lining of 12-inch and 8-inch sewer pipe, cutting of protruding building service connections, grouting openings to stop leaks, heavy cleaning, reinstating building service connections using a cutter, trenchless building service connection repairs, spot Continue Reading
Resident project representative oversaw the renovation to an existing pump station to include a bypass pump under a major highway. Once the bypass system was tested and operational, the renovation could begin. This included all new electrical room MCC’s, VFD’s, transfer switch, new generator, architectural enhancements, all new mechanical, HVAC, plumbing, drainage and three new Continue Reading
Resident project representative for construction phase of new green sand filter iron and manganese treatment system. New potassium permanganate feed system, new process and finish water pumps, new booster pump station and altitude vault. Project included new foundations, block and brick veneer and Mitek roof truss system to house a new water treatment processing equipment. Continue Reading