Resident project representative responsible for the oversight of the building of an interconnection between Killingly and Plainfield will ensure all customers in our Interstate 395 corridor will have adequate water supply well into the future. This investment in drinking water infrastructure includes installing 9,300 feet of 12-inch ductile iron water main, gate valves, tapping sleeves, culvert crossings, replacement of approximately 7 hydrants, etc., allowing water supply optimization and system reliability for all Killingly and Plainfield customers.