The work included a temporary water service system and laterals as well as testing of water main and valves for proper installation and performance.
All related site work included trench excavation, ledge excavation, groundwater dewatering, disposal of excess excavated materials, resetting or removal and replacement of conflicting utilities, filter fabric, bedding, backfill, compaction, road/drive subbase, paving, loam/seed and landscaping. The new water system included the following:
• Water main, valves and hydrants
• Water services
• Disinfection of water main and appurtenances
• Removal and disposal or abandonment of existing water main, valves and services.