The Project includes the following work:
• Replacement of approximately 5,200 linear feet of 10-inch asbestos cement water main with 24-inch cement lined ductile iron water main along the Middlesex Turnpike from Adams Street to Burlington Mall Road, including valves, hydrants, services, appurtenances, and restoration.
• Installation of approximately 800 linear feet of 16-inch cement lined ductile iron water main on Burlington Mall Road from the Middlesex Turnpike intersection to Great Meadow Road, including valves, hydrants, services, appurtenances, and restoration.
• Replacement of a 16-inch butterfly valve at Middlesex Turnpike, including appurtenances and restoration.
• Construction of a below grade venturi flow meter vault on Adams Street for the water distribution interconnection with the Town of Lexington.
• Construction of a below grade flow control vault on Adams Street for the water distribution interconnection with the Town of Lexington.
• Venturi flow meter vault and flow control vault work to be completed prior to water main replacement/installation