The project included the removal of a 21,000 gallon temporary metal water storage tank along with the replacement of a permanent 175,000 gallon concrete water storage tank, a high lift pump station with 3 high lift pumps, associated yard piping and valving for transmission and operation of the expanded system and all materials, equipment, services and construction inherent to the work.





