Resident Project Representative’s Work Included: Improvements to the existing Bridgewater Wastewater Treatment Facility. The major proposed work under this contract includes Civil site work including land clearing, erosion control, earthwork, drainage, grading, site process piping, site utilities, site lighting, pavement, gravel drives, hot mix asphalt pavement, chain-link fence and gates, and utility structures; Site demolition including pavement, piping, repair shop, ferric chemical storage, underground structures and utilities, and concrete pads. Removal and disposal of fuel oil underground storage tanks (USTs). Rehabilitation of existing site including pavement, grading and drainage improvements, site piping and utilities. Natural gas main from Morris Avenue to the WWTF site with appurtenances. Provide gas connections to the Headworks, Dewatering, Administration Buildings for building heat and connection to the new generator as indicated on the drawings. Removal and replacement of the existing primary and secondary sludge clarifier mechanisms including walkways, railings, and gratings.