
Resident project representative responsible for the oversight of furnishing all labor, services, equipment, and materials for approximately 30,000 linear feet of CIPP lining of 12-inch and 8-inch sewer pipe, cutting of protruding building service connections, grouting openings to stop leaks, heavy cleaning, reinstating building service connections using a cutter, trenchless building service connection repairs, spot excavations to replace sewer pipe, disposal of pipe, sewer manhole mortar work, manhole lining, grouting of sewer manholes to stop leaks, repairing of manhole benches and inverts, replacing and resetting of manhole frames, installation of temporary sewer bypass system, paving, and traffic management as specified in the Contract Documents.