The work includes labor, material and equipment, services required for construction, testing, and commissioning of the project:
• Construction of new 6-inch through 12-inch cement lined ductile iron water main including new valves, hydrants, fittings, and service connections.
• Furnishing, installing, and maintaining 2-inch and 6-inch temporary water main to provide water service and fire protection during construction.
• Construction of 15-inch to 36-inch storm drain including manholes and catch basins.
• Construction of new concrete sidewalks and installation of new granite curb.
• Installation of solar powered flashing crosswalk signal.
• Pavement reclaim, pavement milling, full width roadway paving, line striping, and installation of traffic signage.
• Traffic control and coordination with owner, engineer and utility companies.