
Resident project representative responsible for the oversight of sludge thickening improvements that includes removal of an existing abandoned dissolved air flotation thickener (DAF), the installation of a new 3.0m gravity belt thickener (GBT), constructing new partition walls to enclose the GBT room, the replacement of an exterior window wall system with a new wall/window system, installation of a new concrete loading dock, and associated HVAC and electrical work.