Owner’s project representative responsible for the oversight of the construction of a 200’ water tank foundation, steel tank coatings/paints. Project included sandblasting and coating a new tank with a two-part epoxy coating on the interior and exterior of the tank. The OPM was involved with coordinating of steel welding, testing for the water tank installation. The project included all underground DI piping and several valves. In addition, the interior of the tank was utilized as a change order for building a communication building. The communication room houses all the town SCADA and emergency telecommunications. It also houses the local FBI telecommunications as well as an antenna tower that was added to the top of the tank.