Work under this contract includes:
• Construction of new 10”, 24”, and 42” diameter gravity sanitary sewer main and manholes.
• Connections to sanitary utilities.
• Installation of 4”, 6”, 20”, 24”, and 30” force main; fittings, and associated appurtenances.
• 6” jack and bore casing.
• 30” horizontal directional drill.
• Removal and disposal of existing 6” asbestos-cement water main and replacement with new 6” PVC water main; bypass pumping; dewatering, pavement removal and replacement; and all necessary restoration work.
• Associated with this work is testing, trench safety, traffic control, construction stake-out, dewatering, trench safety, sheeting, bypass pumping, pavement removal and replacement, restoration, as-built drawings, paving, and all other related project work necessary to complete the project.