WWTF Improvements (Fall River, MA)

Senior resident project representative that oversaw the demolition, addition and reconstruction of the plants sludge handling building installation. Sludge handling building had two new centrifuges and two new gravity belt filter presses installed. The project required 40’ diameter sludge holding tanks to be constructed with mixers, pumps and covers. We also removed and replaced five waste activated sludge pumps. We installed several skid mounted polymer pumps with all necessary control devices and instrumentation. In addition, the sludge handling building electrical room was completely overhauled with new MCC’s, ATS, Switchgear, several VFD’s, etc.