Resident project representative oversaw the renovation to an existing pump station to include a bypass pump under a major highway. Once the bypass system was tested and operational, the renovation could begin. This included all new electrical room MCC’s, VFD’s, transfer switch, new generator, architectural enhancements, all new mechanical, HVAC, plumbing, drainage and three new Continue Reading
Resident project representative for construction phase of new green sand filter iron and manganese treatment system. New potassium permanganate feed system, new process and finish water pumps, new booster pump station and altitude vault. Project included new foundations, block and brick veneer and Mitek roof truss system to house a new water treatment processing equipment. Continue Reading
Resident Project Representative oversaw post warranty inspection of 8-12”sewer main using CCTV camera to inspect 8,000-10,000LF of sewer lines looking for damage, corrosion, blockage, or collapsing on various streets in Scituate, MA
Assistant resident project representative for the installation of large Diameter 48-inch drain steel piping under roadways and welded dual force mains with directional drilling routing. Restored or replaced various catch basins and detention areas. Set up water bypass to numerous residents, coordinated police details and traffic to facilitate access. Installed 12” DI water mains and Continue Reading
Owner’s project representative responsible for the oversight of the construction of a 200’ water tank foundation, steel tank coatings/paints. Project included sandblasting and coating a new tank with a two-part epoxy coating on the interior and exterior of the tank. The OPM was involved with coordinating of steel welding, testing for the water tank installation. Continue Reading
Sr. Resident Project Representative for new dual 20-inch sewer force main pump station with 48-inch influent deep gravity feed as well as DPW service garage and offices. Oversaw the construction of a 40’ deep wet well with a 12,000 sf DPW garage and office building and maintenance area installed above. Commissioned and tested all pumps, Continue Reading
Resident project representative overseeing installation of 12-inch DI water main and all residential and some commercial services, hydrant and sprinkler loops. Numerous test pits in various locations on rt. 113 were required to determine exact routing and potential conflicts. The project included a new pump station and large welded water storage tank and foundation.
ECI provided oversight for two new PFAS WTF in Devens MA. The major proposed work under this contract includes Civil site work including land clearing, erosion control, earthwork, drainage, grading, site process piping, site utilities, site lighting, pavement, gravel drives, hot mix asphalt pavement, chain-link fence and gates, and utility structures; Site demolition including pavement, Continue Reading
The Mill Pond Treatment Plant Upgrades project includes the installation and construction of a brand new PFAS Building as well as a new Transfer Pump Station which contains an underground Clearwell for finished water. Each of the two new buildings are tied into the existing Mill Pond Water Treatment plant as well as the existing Continue Reading
Resident project representative responsible for overseeing the new construction of a 100ft long BNR tank and 60ft Diameter clarifier. New BNR required all new air SS piping, drop legs connected to an air diffuser field and various air flow meters and MOVs. Clarifier required all new mechanical rotating motors torque box, sweeper arms, scum removal. Continue Reading