• Resident Project Representatives for Treatment Plants, Pump Stations, Road Utility, Bridges, & More!
  • 6 Locations To Serve You
  • Woodstock, CT · North Stonington, CT · Maitland, FL
    Tampa, FL · Hampton Beach, NH · South Dartmouth, MA
    1-860-234-0109
    Mon-Fri, 9am - 5pm
Close

Water Main Inspection – Scituate, MA

Resident Project Representative oversaw post warranty inspection of 8-12”sewer main using CCTV camera to inspect 8,000-10,000LF of sewer lines looking for damage, corrosion, blockage, or collapsing on various streets in Scituate, MA

Treatment Plant and Road Booster Pump Station – Topsfield, MA

Assistant resident project representative for the installation of large Diameter 48-inch drain steel piping under roadways and welded dual force mains with directional drilling routing. Restored or replaced various catch basins and detention areas. Set up water bypass to numerous residents, coordinated police details and traffic to facilitate access. Installed 12” DI water mains and Continue Reading

Water Tank Construction – Middleborough, MA

Owner’s project representative responsible for the oversight of the construction of a 200’ water tank foundation, steel tank coatings/paints. Project included sandblasting and coating a new tank with a two-part epoxy coating on the interior and exterior of the tank. The OPM was involved with coordinating of steel welding, testing for the water tank installation. Continue Reading

“A” Street Pump Station – Framingham, MA

Sr. Resident Project Representative for new dual 20-inch sewer force main pump station with 48-inch influent deep gravity feed as well as DPW service garage and offices. Oversaw the construction of a 40’ deep wet well with a 12,000 sf DPW garage and office building and maintenance area installed above. Commissioned and tested all pumps, Continue Reading

Pump Station, Water Main Installation, Storage Tank – Dunstable, MA

Resident project representative overseeing installation of 12-inch DI water main and all residential and some commercial services, hydrant and sprinkler loops. Numerous test pits in various locations on rt. 113 were required to determine exact routing and potential conflicts. The project included a new pump station and large welded water storage tank and foundation.

Water Treatment Facility Improvements – Devens, MA

ECI provided oversight for two new PFAS WTF in Devens MA. The major proposed work under this contract includes Civil site work including land clearing, erosion control, earthwork, drainage, grading, site process piping, site utilities, site lighting, pavement, gravel drives, hot mix asphalt pavement, chain-link fence and gates, and utility structures; Site demolition including pavement, Continue Reading

Burlington New PFAS Building + Pump Station

The Mill Pond Treatment Plant Upgrades project includes the installation and construction of a brand new PFAS Building as well as a new Transfer Pump Station which contains an underground Clearwell for finished water. Each of the two new buildings are tied into the existing Mill Pond Water Treatment plant as well as the existing Continue Reading

WWTF Improvements (Fall River, MA)

Senior resident project representative that oversaw the demolition, addition and reconstruction of the plants sludge handling building installation. Sludge handling building had two new centrifuges and two new gravity belt filter presses installed. The project required 40’ diameter sludge holding tanks to be constructed with mixers, pumps and covers. We also removed and replaced five Continue Reading

WRRF Project (Littleton, MA)

Resident project representative oversaw the construction of 2 bioreactors, 2 equalization tanks, 1 influent pump station, 2 influent bar screens/wash presses, 3 new sludge storage tanks, and 1 process building. Resident project representative also oversaw the sitework, concrete and rebar installation, as well as all leak testing for tanks. Project included installation of mechanical equipment Continue Reading