Second Resident Project Representative responsible for the construction of sewer force main upgrade with HDPE pipe. Project involved slip lining/installation and butt fusion welding 7400 lf of 18” HDPE (D17). Once bypass was completed, the slip lining was able to commence for 7600 lf. In addition, we installed two new sewer manholes (1 air release Continue Reading
Representative responsible for oversight on the installation of a new sludge handling addition. This project includes two new belt filter presses and all ancillary instrumentation and control panels. New addition included MCC’s and VFD’s in electric room. The equipment installed was two new Wes Tech belt filter presses, all control wiring and pump systems and Continue Reading
Resident project representative oversaw the upgrades for three new secondary clarifier suction pipe mechanisms with fabricated steel drives, using existing RAS and influent piping at bottom of the tank. As well as a new single span ½ bridge walkway for clarifier, New custom tall effluent FRP V-notch weirs and scum baffles bolted to modified tank Continue Reading
Project consists of, but is not limited to, replacing an existing roadway dike and culvert with a box-beam bridge and tide gates. The Work of Project includes, but is not limited to, construction of all proposed site improvements including, but limited to, removal of existing culverts, construction of a precast three-sided culvert and appurtenant structures, Continue Reading