Centrifuge #2 Replacement (Hartford, CT)

Replacement of centrifuge No. 2 with a new centrifuge; replacement of sludge cake conveyor; replacement of sludge feed piping, centrate piping, flushing water piping, polymer piping, and vent piping; modifications to the centrifuge structural steel platform;new dewatering room flooring; replacement of centrifuge No. 2 controls; electrical improvements associated with the new centrifuge and sludge equipment Continue Reading

Sludge Processing Building Upgrades (Hartford, CT)

Construction of new Continuous Emission Monitoring System (CEMS) room; new HVAC system for current and new CEMS rooms; new CEMS for three incinerators including rack/cabinet and miscellaneous components; hazardous building material abatement and removal; modifications to existing incinerator stack supports; safety railing improvements on the SPB roof; electrical improvements associated with the new CEMS room, Continue Reading

Millinocket WTP Post-Filtration GAC System (Millinocket, ME)

Project involved adding granular activated carbon (GAC) pressure vessels inside of an existing 1.5 mgd drinking water treatment facility, with a section of the existing below-grade clearwell sectioned off to create an intermediate storage tank, filtered water from the existing treatment process discharging into the intermediate storage tank where one of two submersible pumps will Continue Reading

Water Distribution Improvements (Hanover, NH)

The work included a temporary water service system and laterals as well as testing of water main and valves for proper installation and performance. All related site work included trench excavation, ledge excavation, groundwater dewatering, disposal of excess excavated materials, resetting or removal and replacement of conflicting utilities, filter fabric, bedding, backfill, compaction, road/drive subbase, Continue Reading

Blackstone Wells WTP (Uxbridge, MA)

Construction of a new 1.2 million gallon per day (MGD) Water Treatment Plant (WTP) that will include two green sand Filters and two PFAS media contactors to remove high concentrations of manganese and PFAS. The building is to be approximately 6,600 square feet constructed of prefabricated metal and is inclusive of process, metal windows, painting, Continue Reading

Killian Water Treatment Plant (Spring Hill, FL)

The work consisted of improvements to the Killian Water Treatment Plant (WTP), The work included: • Installation of a new well pump and wellhouse at the existing KI-5 well. • Construction of a new high service pump station, including concrete foundation, CMU walls, metal roof, pre-engineered wood truss roof supports, pipe gallery, electrical room, crane Continue Reading

Wastewater Treatment Plant Upgrade (Cranston, RI)

Sr. Resident Project Representative was responsible for overseeing construction phase of headworks improvements, secondary treatment system improvements (convert MLE to 4-stage Bardenpho process), tertiary ballasted flocculation and standby power. Oversaw the construction of numerous baffle walls and installation of aeration bubble system which was set to manufacturers specifications. Also oversaw the installation of a secondary Continue Reading

Sludge Thickening Improvements Project Wastewater Treatment Plant (Amherst, MA)

Resident project representative responsible for the oversight of sludge thickening improvements that includes removal of an existing abandoned dissolved air flotation thickener (DAF), the installation of a new 3.0m gravity belt thickener (GBT), constructing new partition walls to enclose the GBT room, the replacement of an exterior window wall system with a new wall/window system, Continue Reading