Construction of new Continuous Emission Monitoring System (CEMS) room; new HVAC system for current and new CEMS rooms; new CEMS for three incinerators including rack/cabinet and miscellaneous components; hazardous building material abatement and removal; modifications to existing incinerator stack supports; safety railing improvements on the SPB roof; electrical improvements associated with the new CEMS room, Continue Reading
Project involved adding granular activated carbon (GAC) pressure vessels inside of an existing 1.5 mgd drinking water treatment facility, with a section of the existing below-grade clearwell sectioned off to create an intermediate storage tank, filtered water from the existing treatment process discharging into the intermediate storage tank where one of two submersible pumps will Continue Reading
The work included a temporary water service system and laterals as well as testing of water main and valves for proper installation and performance. All related site work included trench excavation, ledge excavation, groundwater dewatering, disposal of excess excavated materials, resetting or removal and replacement of conflicting utilities, filter fabric, bedding, backfill, compaction, road/drive subbase, Continue Reading
The project includes construction of a new masonry building addition, two bituminous concrete pedestrian walkways which will connect the exterior doorways of the addition to the existing site layout. It also includes a new security gate system and a dry well to mitigate run-off from the proposed addition. Ancillary work associated with this project will Continue Reading
Construction of a new 1.2 million gallon per day (MGD) Water Treatment Plant (WTP) that will include two green sand Filters and two PFAS media contactors to remove high concentrations of manganese and PFAS. The building is to be approximately 6,600 square feet constructed of prefabricated metal and is inclusive of process, metal windows, painting, Continue Reading
The work consisted of improvements to the Killian Water Treatment Plant (WTP), The work included: • Installation of a new well pump and wellhouse at the existing KI-5 well. • Construction of a new high service pump station, including concrete foundation, CMU walls, metal roof, pre-engineered wood truss roof supports, pipe gallery, electrical room, crane Continue Reading
Sr. Resident Project Representative was responsible for overseeing construction phase of headworks improvements, secondary treatment system improvements (convert MLE to 4-stage Bardenpho process), tertiary ballasted flocculation and standby power. Oversaw the construction of numerous baffle walls and installation of aeration bubble system which was set to manufacturers specifications. Also oversaw the installation of a secondary Continue Reading
Resident project representative responsible for the oversight of sludge thickening improvements that includes removal of an existing abandoned dissolved air flotation thickener (DAF), the installation of a new 3.0m gravity belt thickener (GBT), constructing new partition walls to enclose the GBT room, the replacement of an exterior window wall system with a new wall/window system, Continue Reading
Resident project representative that oversaw the installation of 3500 lf of 12” water main with numerous hydrants and gate clusters. Traffic control was a major component of the job as well as keeping business entrances unencumbered. Due to the state highway work, half of this project was performed at night. In addition to the dozens Continue Reading
Owner’s project representative responsible for the construction of a water pump station. The pump station included a new 30’ x 50’ masonry one story building that included pre-cast plank roof with EPDM roofing. The building was built over an existing 24” well casing. Two chemical rooms were constructed that fed two storage tanks, pumps, injections Continue Reading