Full time on-site Resident Project Representative overseeing the coordination of demolition for existing swtichgear, transformers, generators, and associated wiring. Installation of extensive new Electrical Duct Banks, new 1’380 volt O/H Electrical Service, new pads and transformers and switchgear with new generators and new U/G natural gas service. Select site asphalt milling and repaving. Electrical manholes Continue Reading
The South County Potable Water Transmission Main, CIP 32013, was a Design Build project, with the goal of transporting a large volume of potable water from Riverview FL to Sun City FL. This project consisted of 33,000 linear feet (6.25 miles) of 42 and 48 inch ductile iron pipe. A multitude of materials accompanied this Continue Reading
16 Orchard Street Water Pump Station Project is a retrofit of the existing MDC water pump station in Glastonbury CT. The job includes replacement of the doors, windows, roof, heating system, and remediation of the lead and asbestos existing from original components of the pumping station. Also included is providing the new piping, fittings, and Continue Reading
Resident Project Representative’s Work Included: Improvements to the existing Bridgewater Wastewater Treatment Facility. The major proposed work under this contract includes Civil site work including land clearing, erosion control, earthwork, drainage, grading, site process piping, site utilities, site lighting, pavement, gravel drives, hot mix asphalt pavement, chain-link fence and gates, and utility structures; Site demolition Continue Reading
Second Resident Project Representative responsible for the construction of sewer force main upgrade with HDPE pipe. Project involved slip lining/installation and butt fusion welding 7400 lf of 18” HDPE (D17). Once bypass was completed, the slip lining was able to commence for 7600 lf. In addition, we installed two new sewer manholes (1 air release Continue Reading
Representative responsible for oversight on the installation of a new sludge handling addition. This project includes two new belt filter presses and all ancillary instrumentation and control panels. New addition included MCC’s and VFD’s in electric room. The equipment installed was two new Wes Tech belt filter presses, all control wiring and pump systems and Continue Reading
Resident project representative oversaw the upgrades for three new secondary clarifier suction pipe mechanisms with fabricated steel drives, using existing RAS and influent piping at bottom of the tank. As well as a new single span ½ bridge walkway for clarifier, New custom tall effluent FRP V-notch weirs and scum baffles bolted to modified tank Continue Reading
Project consists of, but is not limited to, replacing an existing roadway dike and culvert with a box-beam bridge and tide gates. The Work of Project includes, but is not limited to, construction of all proposed site improvements including, but limited to, removal of existing culverts, construction of a precast three-sided culvert and appurtenant structures, Continue Reading