• RPRs and Construction Observers for Treatment Plants, Pump Stations, Road Utility, Bridges, & More!
  • 6 Locations To Serve You
  • Woodstock, CT · North Stonington, CT · Maitland, FL
    Tampa, FL · Hampton Beach, NH · South Dartmouth, MA
    1-860-234-0109
    Mon-Fri, 9am - 5pm
Close

Onsite Septic and Drainage System (Kingston, MA)

Our RPR oversaw the significant topography regrading of a large south shore development. Within that footprint, was the installation of numerous drain and sewer manholes with associated piping systems. In addition to that was a large onsite septic disposal. All finish grading, looming, seeding is being completed in the Fall of 2024.

Scituate Sewer Rehab Project (Scituate, MA)

Resident project representative responsible for the oversight of furnishing all labor, services, equipment, and materials for approximately 30,000 linear feet of CIPP lining of 12-inch and 8-inch sewer pipe, cutting of protruding building service connections, grouting openings to stop leaks, heavy cleaning, reinstating building service connections using a cutter, trenchless building service connection repairs, spot Continue Reading

Varney Brook Pump Station – Dover, NH

Resident project representative oversaw the renovation to an existing pump station to include a bypass pump under a major highway. Once the bypass system was tested and operational, the renovation could begin. This included all new electrical room MCC’s, VFD’s, transfer switch, new generator, architectural enhancements, all new mechanical, HVAC, plumbing, drainage and three new Continue Reading

Water Treatment Facility Improvements – Newmarket, NH

Resident project representative for construction phase of new green sand filter iron and manganese treatment system. New potassium permanganate feed system, new process and finish water pumps, new booster pump station and altitude vault. Project included new foundations, block and brick veneer and Mitek roof truss system to house a new water treatment processing equipment. Continue Reading

Water Main Observation – Scituate, MA

Resident Project Representative oversaw post warranty observation of 8-12”sewer main using CCTV camera to observe 8,000-10,000LF of sewer lines looking for damage, corrosion, blockage, or collapsing on various streets in Scituate, MA

Treatment Plant and Road Booster Pump Station – Topsfield, MA

Assistant resident project representative for the installation of large Diameter 48-inch drain steel piping under roadways and welded dual force mains with directional drilling routing. Restored or replaced various catch basins and detention areas. Set up water bypass to numerous residents, coordinated police details and traffic to facilitate access. Installed 12” DI water mains and Continue Reading

Water Tank Construction – Middleborough, MA

Owner’s project representative responsible for the oversight of the construction of a 200’ water tank foundation, steel tank coatings/paints. Project included sandblasting and coating a new tank with a two-part epoxy coating on the interior and exterior of the tank. The OPM was involved with coordinating of steel welding, testing for the water tank installation. Continue Reading

“A” Street Pump Station – Framingham, MA

Sr. Resident Project Representative for new dual 20-inch sewer force main pump station with 48-inch influent deep gravity feed as well as DPW service garage and offices. Oversaw the construction of a 40’ deep wet well with a 12,000 sf DPW garage and office building and maintenance area installed above. Commissioned and tested all pumps, Continue Reading