Owner’s project representative responsible for the construction of a water pump station. The pump station included a new 30’ x 50’ masonry one story building that included pre-cast plank roof with EPDM roofing. The building was built over an existing 24” well casing. Two chemical rooms were constructed that fed two storage tanks, pumps, injections Continue Reading
Sr. Project Representative for a major Wastewater treatment plant upgrade. Upgrade included complete electrical upgrade from electrical service to switch gears, Main MCCs, ATS, numerous new control panels, house service panels, conduit and wire to all equipment Also include was new generator 1000 KVA Cummins generator, new influent pumps, primary sludge pumps, Plant water pumps, Continue Reading
Our RPR oversaw the significant topography regrading of a large south shore development. Within that footprint, was the installation of numerous drain and sewer manholes with associated piping systems. In addition to that was a large onsite septic disposal. All finish grading, looming, seeding is being completed in the Fall of 2024.
Resident project representative responsible for the oversight of furnishing all labor, services, equipment, and materials for approximately 30,000 linear feet of CIPP lining of 12-inch and 8-inch sewer pipe, cutting of protruding building service connections, grouting openings to stop leaks, heavy cleaning, reinstating building service connections using a cutter, trenchless building service connection repairs, spot Continue Reading
Resident project representative oversaw the renovation to an existing pump station to include a bypass pump under a major highway. Once the bypass system was tested and operational, the renovation could begin. This included all new electrical room MCC’s, VFD’s, transfer switch, new generator, architectural enhancements, all new mechanical, HVAC, plumbing, drainage and three new Continue Reading
Resident project representative for construction phase of new green sand filter iron and manganese treatment system. New potassium permanganate feed system, new process and finish water pumps, new booster pump station and altitude vault. Project included new foundations, block and brick veneer and Mitek roof truss system to house a new water treatment processing equipment. Continue Reading
Resident Project Representative oversaw post warranty observation of 8-12”sewer main using CCTV camera to observe 8,000-10,000LF of sewer lines looking for damage, corrosion, blockage, or collapsing on various streets in Scituate, MA
Assistant resident project representative for the installation of large Diameter 48-inch drain steel piping under roadways and welded dual force mains with directional drilling routing. Restored or replaced various catch basins and detention areas. Set up water bypass to numerous residents, coordinated police details and traffic to facilitate access. Installed 12” DI water mains and Continue Reading
Owner’s project representative responsible for the oversight of the construction of a 200’ water tank foundation, steel tank coatings/paints. Project included sandblasting and coating a new tank with a two-part epoxy coating on the interior and exterior of the tank. The OPM was involved with coordinating of steel welding, testing for the water tank installation. Continue Reading
Sr. Resident Project Representative for new dual 20-inch sewer force main pump station with 48-inch influent deep gravity feed as well as DPW service garage and offices. Oversaw the construction of a 40’ deep wet well with a 12,000 sf DPW garage and office building and maintenance area installed above. Commissioned and tested all pumps, Continue Reading